Second course of forms in place.
Penetrations installed for HVAC and plumbing. T-wall connections cut and steel installed. Window openings being prepared for buck installation.
Bracing and alignment system system being installed after fourth course of forms is in place.
All bracing installed and additional courses of forms in place.
Project nearing completion of ICF installation.
Final bracing installed with window and door bucks in place. Front arched parapet wall being readied for desing cut-out.
Pour Day
Roof Construction
Roofing steel erection with view of steel embed plate weld connections.
External Insulation and Finish System (EIFS) Application
Integrated Wall Systems is proud to have worked with Don Krueger Construction Company on this project. Please consider them for your ICF construction needs.
Don Krueger Construction Co.
P.O. Box 3613
Victoria, TX 77903
(P) 361-573-5291
(F) 361-573-0162
|

Integrated Wall Systems
361.570.1789 phone
361.574.8973 fax
5003-J John Stockbauer
Victoria . Texas . 77904
Drop Us An E-Mail
Home • About Us • Why ICFs • Products • Residential • Commercial • Technical Data • Training • ICF House Plans
©2006 Integrated Wall Systems, Inc.
Site designed and maintained by Outburst Advertising